For traffic calming or water deflection, this installation is completed by shaping the new asphalt hump on top of the existing asphalt. Expected to last up to 10 years or more.
Process
Identify, measure, and mark the area for installation and remove any loose debris from the installation area.
Apply tack to the entire marked out area to ensure increased adhesion.
Apply asphalt, rake to the desired finish shape and height.